Full installation of a new convenience store
Installed AC to serve the shop floor for the heat gains of the integral cabinets and an AC in the bakery for the client, point of use water heaters to serve the store toilet, bakery and staff rooms, ventilation install to serve occupied rooms and extract to toilet and heat extract from the refrigeration monoblocs
Installed AC to serve the shop floor for the heat gains of the integral cabinets and an AC in the bakery for the client, point of use water heaters to serve the store toilet, bakery and staff rooms, ventilation install to serve occupied rooms and extract to toilet and heat extract from the refrigeration monoblocs