Power Supply Installation for a Temporary Water Chiller

Services Provided: Electrical

600A Power Supply Installation for IPL Schoeller | Airkool

Overview:

Airkool was contracted by IPL Schoeller to install a new external 600A power supply at their Hull site, to run a temporary water chiller system.

Our Solution:

The new supply had to run from the existing panel board to the chiller location outside, without blocking the site’s walkways. To do this, our electrical team designed and installed a heavy-duty steel frame system to carry a 450mm cable ladder overhead, so staff kept full access to the walkways throughout.

We then installed 2No 150mm² 4-core SWA (steel wire armoured) cables along the new cable ladder, from the existing panel board to an external IP-rated switch fuse. SWA cable was chosen because it is robust and gives mechanical protection in an external, industrial environment.

The existing MCCB (moulded case circuit breaker) was rated at 250A, which wasn’t enough for the new load. As part of the works, we upgraded it to a 600A MCCB so the supply could safely meet the full power demand of the temporary chiller.

“The work was carried out in a safe and tidy manor. The Airkool operatives on site took their time to make sure the installation was carried out to a high standard. Very happy with the Airkool team.

Outcome:

The works were planned and carried out safely, with minimal disruption to day-to-day activity on site and walkways kept clear throughout. IPL Schoeller now has a dedicated, correctly rated 600A external supply, so the temporary water chiller can run reliably and safely.